Excavataion , Dewatering ,Cabling Pulling,Concrete Shuttering for Duct Bank Structure

Excavataion , Dewatering ,Cabling Pulling,Concrete Shuttering for Duct Bank Structure shoring & backfilling

Location: SWCC yanbu
Equipments used: dewatering pumps, sheet pelting, backhoe loader, wheel loader, transmixer, concrete pumps, cable pulling winch, compacting rollers,dump trucks
Work description: Excavataion , Dewatering ,Cabling Pulling,Concrete Shuttering for Duct Bank Structure shoring & backfilling
Client: Aramco
Issue Date: 6/13/2010
Duration: 10 months
Cost: SR. 660000