Repairing & Fixing Sign boards

Repairing and fixing Of Safety Sign Board

Repairing and fixing Of Safety Sign Board

Location: Light industrial park Yanbu-Al-Sinaiyah
Client: Linde Arabian Cont. Co. Ltd
Equipments: mixers, Concrete Pump, Backhoe loader,Compacting roller, Surveying instrument, Power trower, bar bending and cutting machine
Work description: Repairing and fixing Of Safety Sign Board
Issue Date: 10/27/2008
Duration: 1month
Cost: SR. 50,000


View Larger Map

Concrete Ramp Platform Ladder Cooling Insulation Hand rail Fencing Project

Fencing Project

Fencing Project

Location: Sabic gas plant heavy industrial area
Equipments used: Welding machine , Scaf folding,forklift,crane,welding machine
Work description: Fencing projects
Client: Linde Arabian Cont. Co. Ltd
Issue Date: 2/18/2009
Duration: 1month
Cost: SR. 60,000


View Larger Map

Backfilling And Compaction

Excavation,Backfilling and Cable Project

Excavation ,Backfilling and Cable

Location: Sabic gas plant
Equipments used : Concrete trans mixers, Concrete Pump, Backhoe loader,Compacting roller, Surveying instrument, Power trower, bar bending and cutting machine
Client: Jamal Nisar Khan Est. For Elect Cont.
Issue Date: 7/12/2010
Duration: 1 year
Cost: SR. 450,000


View Larger Map

Electrical Duct

Additional Electric Duct bank

Additional Electric Duct bank

Location: Light industrial park Yanbu-Al-Sinaiyah
Equipments used: Wheel loader,dump trucks, plate compactor, excavator, skid loader
Work description: Additional Electric Duct bank
Client: Linde Arabian Cont. Co. Ltd
Issue Date: 11/23/2008
Duration: 2months
Cost: SR. 150,000


View Larger Map

Dewatering

Excavataion , Dewatering ,Cabling Pulling,Concrete Shuttering for Duct Bank Structure

Excavataion , Dewatering ,Cabling Pulling,Concrete Shuttering for Duct Bank Structure shoring & backfilling

Location: SWCC yanbu
Equipments used: dewatering pumps, sheet pelting, backhoe loader, wheel loader, transmixer, concrete pumps, cable pulling winch, compacting rollers,dump trucks
Work description: Excavataion , Dewatering ,Cabling Pulling,Concrete Shuttering for Duct Bank Structure shoring & backfilling
Client: Aramco
Issue Date: 6/13/2010
Duration: 10 months
Cost: SR. 660000


View Larger Map